Abatement Plan Work-Around in Maximo
Indian Affairs, Division of Facilities
Management and Construction
Safety & Health Deficiency Abatement/Correction Plan Process For Non-
Trust Network Users
Field Sites receive an Annual Safety and Health Inspection Report following their
inspection by a Safety Inspector.
The safety deficiencies must be abated in the Abatement Plan (Plan) within 30 days of
the Safety Inspection finalization date.
Once the local Facilities Management Program (FMP) manually completes the Plan, the
FMP can take or submit the Plan to the Regional Facility Manager (RFM), or other
Regionally determined designee, for entry into IA-FMS S&CAP.
Once the Plan is finalized in IA-FMS S&CAP, those deficiencies can be approved and
moved into Maximo Deferred Maintenance Work Orders for funding consideration.
IA-FMS Abatement Plan Work-Around
Webinar
2
Accessing the Abatement Plan Template
3
Accessing the Abatement Plan Template
abatement
IA-FMS Abatement Plan Work-Around
Webinar
4
Accessing the Abatement Plan Template
IA-FMS Abatement Plan Work-Around
Webinar
5
Accessing the Abatement Plan Template
IA-FMS Abatement Plan Work-Around
Webinar
6
Abatement Plan Template Report
IA-FMS Abatement Plan Work-Around
Webinar
7
Download the Abatement Plan Template Report as an Excel File
IA-FMS Abatement Plan Work-Around
Webinar
8
Download the Abatement Plan Template Report as an Excel File
Report will download to computer as an Excel File
Open the file using Excel
Save the File as an Excel document
IA-FMS Abatement Plan Work-Around
Webinar
9
Opening Excel File
10
You may get this message when attempting to open the
Excel File.
Click Yes
Template Overview-Inspection Heading
1
2
3
1. Inspection Number
2. Region inspection was performed
3. Site inspection was performed
4. Agency inspection was performed
4
IA-FMS Abatement Plan Work-Around
Webinar
11
Template Overview- Location Information
If there is more than one building in an inspection, each building will
have its own section of deficiencies.
1
2
3
IA-FMS Abatement Plan Work-Around
Webinar
1. Maximo ID (Location ID) identifier in Maximo
2. Structure # of building
3. Description of location in Maximo
12
Template Overview- Inspection Deficiencies
Deficiencies
found by the
Safety Inspector.
Category S
(Safety).
Category H
(Handicapped).
These fields are
READ ONLY.
IA-FMS Abatement Plan Work-Around
Webinar
13
Template Overview- Abatement Fields
All of the following fields are
REQUIRED in this section:
Deficiency Type
Format
Functional
Operational
Planned Corrective Measure
Format
Any text
Planned Completion Date
Format
Mm/dd/yyyy
No Cost (Y/N)
Format
N
Y
IA-FMS Abatement Plan Work-Around
Webinar
14
Abatement Fields- Deficiency Type: Functional vs Operational
Functionaldeficiencies involve
fixing something that is broken,
meaning the thing needing to be
fixed is not functioning properly.
This typically involves something
needing to be built/modified or a
maintenance activity that would
qualify for supplemental funding.
Operationaldeficiencies involve
correcting something that is
impacting the operations of the
building.
Format
Operational
Functional
IA-FMS Abatement Plan Work-Around
Webinar
15
Abatement Field -Planned Corrective Measure
Permanent implemented solution.
Eliminate any condition of non-
compliance with a code caused by
a deficiency.
Format
Text
IA-FMS Abatement Plan Work-Around
Webinar
16
Abatement Field: Planned Completion Date
When the Planned Corrective
Measure either was completed, or
is anticipated to be completed.
Format
Mm/dd/yyyy
IA-FMS Abatement Plan Work-Around
Webinar
17
Abatement Field: No Cost (Y/N)
Options are Y (Yes) or N (No).
Used to determine if the deficiency
will have associated costs.
To be used for cost estimating
purposes.
Format
Y
N
IA-FMS Abatement Plan Work-Around
Webinar
18
Interim Measure Fields
These fields
are required
only if the
Planned
Completion
Date for a
deficiency is
30 days or
more after the
inspection
finalized date.
IA-FMS Abatement Plan Work-Around
Webinar
19
Inspection Finalized Date Interim Measure
The Inspection
Finalized Date is
found for each
deficiency in the
Inspection
Deficiencies
Section of the
Abatement Plan
Template Report.
If the Planned
Completion Date
for a deficiency is
30 days after the
Inspection
Finalized Date,
the Interim
Measure section
needs to be
completed.
IA-FMS Abatement Plan Work-Around
Webinar
20
Interim Measure Field Reason for Delay
Reason why the
deficiency couldn’t be
completed within 30
days of the inspection
finalized date.
Format
Text
IA-FMS Abatement Plan Work-Around
Webinar
21
Interim Measure Field- Interim Measure Description
An action taken to at least
partially mitigate the hazard or
consequences of not
permanently correcting a
deficiency within 30 days.
Format
Text
IA-FMS Abatement Plan Work-Around
Webinar
22
Interim Measure Field Planned Completion Date
The date when the interim
measure is to be completed.
Format
Mm/dd/yyyy
IA-FMS Abatement Plan Work-Around
Webinar
23
Interim Measure with Costs
The following fields are
required if an interim measure
has costs:
Type (Material, Tool, Labor)
Cost Description
Quantity
Cost/Rate
Hours
Planned Funding Method
(O&M, FI&R, MI&R, No
Costs)
Standing Parent
IA-FMS Abatement Plan Work-Around
Webinar
24
Interim Measure Field - Type (Material, Tool, Labor)
Does the cost have
materials, tools, or
labor?
Format
Material
Tool
Labor
IA-FMS Abatement Plan Work-Around
Webinar
25
Interim Measure Field Cost Description
Description of the
Type (Material, Tool,
Labor) field.
Format
Text
IA-FMS Abatement Plan Work-Around
Webinar
26
Interim Measure Field - Quantity
How many of the Type
(Material, Tool, Labor)
field.
Format
Integer with up to
two decimal place
(ie 2.50)
IA-FMS Abatement Plan Work-Around
Webinar
27
Interim Measure Field Cost/Rate
IA-FMS Abatement Plan Work-Around
Webinar
Cost
Format
Integer with up to
two decimal place
(ie 2.50)
28
Interim Measure Field - Hours
How many hours
needed?
If Type of Material
is chosen enter 0
for the Hours field.
Format
Integer with up
to two decimal
places (ie.
2.50)
IA-FMS Abatement Plan Work-Around
Webinar
29
Interim Measure Field- Planned Funding Method
What is the work order
classified as?
O&M (Operations and
Maintenance)
>$2500
FI&R (Facilities
Improvement and
Repair)
$250,000 +
MI&R (Minor
Improvement and
Repair)
$2,500-$250,000
Format
O&M
FI&R
MI&R
No Costs
IA-FMS Abatement Plan Work-Around
Webinar
30
Interim Measure Field Standing Parent
If Planned Funding Method of O&M is
chosen you can enter a Standing
Parent
Go To > Work Orders >IA Work
Order Tracking.
In the Maximo ID field input the
appropriate Maximo ID.
In the Work Type field enter
=RPFM, =RPFO
Press enter on your keyboard.
A list of result is displayed. From
this list find the appropriate
Standing Parent Work Order.
Copy the Maximo ID of the
appropriate Standing Parent
Work Order and paste in the
Standing Parent field on the
Excel sheet.
If Standing Parent is not
known/doesn’t exist enter None
IA-FMS Abatement Plan Work-Around
Webinar
31
Format
None
Maximo ID of Standing
parent (ie AB1000000)
Interim Measure Field Planned Funding Method of No Costs
Interim Measure with No
Costs
If an interim measure has no
costs, fill out the Planned
Funding Method field with No
Costs.
The Standing Parent field
should read as None.
Leave the following fields
blank:
Type (Material, Tool,
Labor)
Cost Description
Quantity
Cost/Rate
Hours
Standing Parent
IA-FMS Abatement Plan Work-Around
Webinar
32
Abatement Plan Completed
Once all deficiencies have been abated make sure to save the file as
an Excel (.xls) file
Submit to the agency or regional facilities manager for upload in
S&CAP.
IA-FMS Abatement Plan Work-Around
Webinar
33
Demonstration
Help Desk Contact Information
Email
Phone
866-706-2011 ( Toll Free)